Commercial Fitouts
In commercial work the build is the easy part. The hard part is the building manager, the after-hours access, the fire certifier and the date you have to open.
Overview
Built around your trading hours, not ours.
A retail or hospitality fitout that shuts the doors for three weeks costs more than the fitout. We plan the sequence backwards from your opening date and stage the noisy, disruptive work into the windows your business can absorb — nights, Sundays, or a two-day shutdown instead of a fortnight.
That takes coordination, not heroics: base-building approvals lodged early, after-hours access booked with the building manager weeks ahead, and trades briefed on what can and cannot run while customers are on the floor.
The documentation landlords actually ask for
Most fitout disputes are paperwork disputes. We assemble the package as we go rather than scrambling for it at practical completion.
- Fitout application and base-building approval lodged before trades are booked
- Certificates of currency for us and every subcontractor on site
- Inductions, SWMS and a site-specific safety plan matched to the building's requirements
- Fire services, essential-services and electrical certificates at completion
- As-built drawings and O&M manuals issued in one indexed pack
- Make-good scope agreed in writing at the start of the lease, not the end
What we fit out
- Retail — shopfronts, joinery, lighting, POS and stockroom, staged around trade
- Hospitality — commercial kitchens, exhaust and grease management, bars, seating
- Medical & allied health — consult rooms, sterilisation, lead-lined walls, accessible amenities
- Office — partitioning, meeting rooms, acoustic treatment, data and comms rooms
Make-good and defit
We also do the unglamorous end: stripping a tenancy back to the landlord's agreed condition, with a scope confirmed against the lease so you're not paying to rebuild something the outgoing schedule never required.
Included
What sits inside the contract.
Approvals & applications
Fitout applications, base-building approval and building-manager coordination.
Staged programming
Sequenced backwards from your opening date, with after-hours windows booked early.
Partitions & ceilings
Acoustic-rated walls, suspended ceilings, bulkheads and glazed partitions.
Services
Electrical, data, mechanical, hydraulic and fire, coordinated to one set of drawings.
Joinery & finishes
Shop-drawn joinery measured on site, plus flooring, tiling, glazing and paint.
Certification pack
Essential services, as-builts and O&M manuals issued as one indexed handover.
How it runs
From tenancy plan to opening day.
01
Site & lease review
We walk the tenancy, read the fitout guide, and flag what the base building will and won't allow.
02
Scope & program
Fixed price against the tenancy drawings, with a program built backwards from your opening date.
03
Approvals & access
Applications lodged, inductions completed, after-hours access booked with the building manager.
04
Fitout & handover
Staged works, weekly reports, certification pack and a defects list closed before you open.